Bridge Foundations 001

Tullamore Bypass

DAWSON-WAM were subcontracted to Grahams to install all the load bearing piles and temporary sheet piling for the Tullamore Bypass road scheme in Co. Offaly. The project involved the construction of five river crossings, a crossing over the Grand Canal, one railway crossing, two underpasses and two further bridges.

In total DAWSON-WAM installed 164 bearing piles and 800m2 of sheet piling to support the bridge structures in a phased construction process. Each phase required works to be completed over an intense period often under restricted traffic conditions.

These crossings were constructed through a special area of conservation and were completed under strict environmental constraints.

Tullamore Bypass - Main
Bullet
Click to enlarge
Client:
Grahams (Dromore) Ltd.
Design Engineer:
Jacobs/Grontmij
Additional Project Photography
Tullamore Bypass 1
Tullamore Bypass 2
Tullamore Bypass 3
Tullamore Bypass - Main
Bullet
Click to enlarge
Graphic Design and Content Managed Website by
BluegatorCreative