Connaught 001

Close Proximity

Through the use of DAWSON-WAM's silent and vibration-free pile installation we can offer a virtually zero tolerance installation when working adjacent to existing buildings and structures. This can be extremely beneficial to clients in maximising space when working within built up environments such as city centre sites.

For a Client's peace of mind DAWSON-WAM can carry out all pile testing, vibration & noise monitoring and pile deflection analysis when working in close proximity of adjacent structures.

Please browse our case study on the Connaught Hotel in Mayfair which best showcases our capabilities.

Featured Projects

Priority Housing Project Plymouth
Connaught Hotel Extension
Ormeau Road
Priority Housing Project Plymouth
Plymouth
Connaught Hotel Extension
Mayfair, London
Ormeau Road
Belfast
DAWSON-WAM ltd was appointed by Coyde Construction Ltd to carry out the installation of a secant piled retaining wall to enable the construction of a basement under a Priority Housing Project for the Spectrum Housing Group in Plymouth.
DAWSON-WAM completed all the piling and propping for a 12m deep basement as part of the extension works for Connaught Hotel in London's exclusive Mayfair district.
DAWSON-WAM were appointed by Kevin Watson Construction to carry out the installation of a secant piled basement, reinforced concrete capping beam.
 
Graphic Design and Content Managed Website by
BluegatorCreative